JINYU · Planning guide
Beverage cooler power interruption: prepare an inquiry record
A power interruption inquiry needs a sequence of observations. Record when staff first noticed the interruption, what they saw on the cabinet and when power was reported available again. Keep an observed time separate from a time supplied later by a building manager.
This guide covers the initial incident note, display photographs, a record for several affected cabinets and the follow-up inquiry. It is a documentation guide: it does not specify restart settings, cooling recovery times or stock handling decisions.
Use the GN-868FM model reference when the inquiry concerns that model. Attach the event record through the inquiry entry and keep the same cabinet labels in every photograph and follow-up. The model and series links provide the product context for the discussion.
Questions to resolve before ordering
Recorded cabinet dimensions
| Model | Width × depth × height |
|---|---|
| GN-868FM | 1220 × 690 × 2048 mm |