JINYU · Planning guide

Display refrigeration ventilation: air paths and site review

Ventilation planning begins with the exact cabinet drawing. Mark the intake, discharge and maintenance zones before drawing a decorative counter around the equipment. Body dimensions and required installation space belong in separate entries on the site plan.

GN-1200R2 measures 1200 × 730 × 1200 mm. GN-900L measures 900 × 740 × 1400 mm. These recorded envelopes provide an initial layout reference; neither figure specifies a universal wall gap, grille-cover design or acceptable alcove detail.

Prepare a room survey that identifies nearby cooking equipment, windows, entrances and air-conditioning outlets. Include ambient observations at the proposed location. Ask for the offered configuration's installation requirements and have the responsible site designer review them with the actual plan.

The questions below separate furniture decisions from room conditions and maintenance access. Keep the accepted drawing with the equipment schedule. Review later changes to counter panels, signage, storage or ceiling services against that record before allowing them to alter the installation.

Questions to resolve before ordering

Recorded cabinet dimensions

Cabinet body dimensions; installation space and interior fit require a separate review.
ModelWidth × depth × height
GN-1200R21200 × 730 × 1200 mm
GN-900L900 × 740 × 1400 mm