Skip to content
JINYUCOMMERCIAL KITCHEN EQUIPMENT
Menu

JINYU · Buyer question

Can equipment be supplied for large commercial kitchen projects?

Send a room-by-room equipment schedule to request supply for a large commercial kitchen project. Include the quantities and the work each station needs to do. The model pages identify equipment you can put on that schedule, but availability for a whole project needs an order-specific reply. Request a response against every equipment line, with the offered model, quantity and configuration. For a project with several kitchens, identify each room on both the schedule and the floor plan so a reply about one station cannot be mistaken for the complete order.

Give each station a reference, such as Kitchen A soup station or Kitchen B wok station. Use that reference on drawings, equipment lists and later revisions. Keep a quantity for each room and a total for the project. For example, two soup stations in Kitchen A and one in Kitchen B give three stations to specify. That count describes the proposed layout, not a production-capacity calculation. Add the menu, intended pots and work during the busiest service period to explain what the equipment must do. List supporting counters and cookware separately, and mark which items you want included in the offer.

Compare the actual cooking surfaces before combining equipment lines. JY-TSPT-5D has one flat cooking surface in a 400 x 500 x 200 mm countertop body. Its record specifies magnetic flat-bottom cookware, which is not included. JY-TSPA5+5 has one flat zone and one concave wok zone in an 850 x 500 x 200 mm body. It therefore answers a different station brief from two flat cooking positions. Put the model link beside each line and show the intended pot or wok on the counter drawing. Leave installation space and cookware handling space visible as separate parts of the layout.

Record the electrical ratings with the quantities. JY-TSPT-5D lists 5 kW and 220 V. JY-TSPA5+5 lists 5 kW for each zone, 10 kW total and 220 V. Three JY-TSPT-5D units would have a combined nameplate rating of 15 kW. That arithmetic does not size the site circuit. Give the project electrical designer the complete equipment schedule, room locations and available supply, then request connection details for the offered configurations. Review counter support, service access and ventilation arrangements against the installation information for those units.

Group the schedule by fitout phase if rooms open at different times. State when each receiving area and counter will be available, with the access route and unloading arrangements. Request proposed equipment-ready and arrival dates for each group, and identify who handles storage, positioning, connections and commissioning. Keep substitutions attached to the original station reference so a model change reaches the drawing and utility schedule. Send the schedule and room plans through the inquiry entry below. Compare the reply line by line, including supplied items and work arranged separately, before building the equipment order into the opening programme.

Prepare this information

  • Room and station references linked to the equipment drawings
  • Model quantities by room, project total and fitout phase
  • Exact cooking configurations, cookware and included accessories
  • Site utilities and connection details for each offered model
  • Counter support, working access and receiving arrangements
  • Project-specific supply scope, exclusions and proposed substitutions

Compare the commercial induction cooking model records

Matching model records

Discuss your site and product arrangement

Send your equipment brief