JINYU · Buyer question
How do I draw steamer door movement around a loading trolley?
Use a door drawing for the selected steamer configuration. Mark the hinge side, door edge and handle projection at the positions needed for loading. Overlay these on the measured trolley layout. A front photograph can help identify the arrangement, but a closed-door image leaves the opening path unmeasured.
JY-HXZG-25 and JY-HXZG-30 are recorded as three-door seafood steamers; JY-ZFG-15S has double doors. Draw the doors you intend to access during the same loading sequence. Show an operator reaching each handle with the trolley parked, then transferring a tray through the opening. Keep the plan specific to the selected model and width option.
Record any contact or repositioning in the walkthrough. If the door path is absent from the available drawing, request that measurement with the model inquiry and keep it labelled as unresolved on the working sketch. Send both the closed footprint and proposed loading arrangement. The resulting comparison should show which trolley position lets the demonstrated door and tray movements take place.
Prepare this information
- Selected model and width option identified
- Hinges, handles and opening path drawn
- Trolley movement during door access recorded
Compare commercial induction cooking equipment