Ventilation belongs in the kitchen layout from the start. Cooking produces heat, vapour and fumes that need removal near the cooking position. Plan around the actual dishes and the busiest service period, including wok cooking, boiling and steaming where those tasks are on your menu. An equipment list alone does not describe the cooking load. Send the ventilation designer a menu and a schedule showing which stations run together.
Describe the operating schedule by cooking position. For a wok station, note the dishes, batch sizes and cooking frequency. For a soup station, record the pot dimensions, whether cooking is open or lidded, and how often staff lift the lid during service. Separate preparation before opening from tasks that overlap during service. This gives the designer a concrete brief instead of a general description such as an Asian kitchen. Label planned tasks as plans and observations from an existing kitchen as observations.
JY-TSPA5+5 combines one flat zone and one concave wok zone in an 850 x 500 x 200 mm countertop body. Each zone is rated at 5 kW, for 10 kW total, with a listed supply of 220 V. Mark the body on the counter drawing, then add the intended cookware and handle positions. Tell the designer whether both zones will operate together. The listed dimensions describe the appliance body; they do not specify a hood size, installation clearance or extraction rate.
For a separate soup position, JY-TSPT-5D has one flat induction surface and a 400 x 500 x 200 mm body, rated at 5 kW and 220 V. It uses magnetic flat-bottom cookware, which is not included. Put the intended pot on the drawing with its height and working position. Both linked models use induction, but the cooking process still belongs in the ventilation brief. Neither model record gives a kitchen extraction rate, and adding the electrical ratings does not establish one.
Include the canopy footprint, duct route, replacement-air provision and cleaning access in a site survey. Room fans can disturb fume capture, so show their positions too. For the appliances themselves, request the installation instructions identifying cooling-air paths and required clearances. An appliance cooling opening and an overhead cooking extractor do different jobs. Ask the site designer to review both when the counter includes enclosing panels or adjacent equipment.
Send the menu schedule, dimensioned counter plan, site photographs and the two model references through the inquiry entry. Include existing ventilation drawings or performance records when available, and identify any gas appliances on the same line separately. Request the equipment installation information for the ventilation designer, then have the designer specify extraction for the complete site. Keep the final layout and system performance record with the equipment schedule so a later station change can be compared with the original design.
Prepare this information
- Menu tasks, batch sizes and stations operating together at peak service
- Wok and pot dimensions, lid use and cookware handle positions
- Appliance body footprints and the intended counter arrangement
- Canopy footprint, duct route, replacement-air provision and room fan positions
- Installation instructions for cooling-air paths and model-specific clearances
- Site photographs, cleaning access, ventilation records and shared gas appliances