JINYU · Buyer question

How long does wholesale bag production take?

Ask for a dated schedule for your wholesale order. The linked non-woven model pages publish no standard production duration. For an order with several bag versions, request completion dates and quantities for each version, plus the date for the whole order. A first lot may cover one shop allocation while other versions remain in production. Its completion date cannot tell you when the full order will be ready.

Build the schedule around identifiable order lines. Give each size, body colour and artwork revision a line reference and quantity. JY-NWB-DC01 has a D-cut opening, JY-NWB-LH01 has attached loop handles, and JY-NWB-LM01 has a laminated non-woven body. Record your requested dimensions beside the model code. If a reply combines these lines under one date, ask whether that date covers every bag ordered or only a stated lot.

Put the expected production start beside the event it depends on, such as review of an identified artwork file or sample. Ask which event applies to your project. A planned start and a reported actual start belong in separate entries. Where the reply quotes a duration, ask whether it counts calendar days or working days and which non-working dates it excludes. Keep any sample preparation and review dates visible so a delayed review can be traced to the affected production dates.

For each progress update, record the date, order line, quantity reported finished and quantity dispatched. Use cumulative finished totals that include bags already dispatched. Subtract that total from the ordered quantity to find the balance still to finish. Subtract the cumulative dispatched total from the ordered quantity to find the balance still to dispatch. Ask whether each new figure is a running total or an addition to the previous update before updating your records. Finished bags may still await packing or collection. A reply that says partly complete needs the corresponding line references and quantities before you allocate those bags to a shop.

Compare a proposed first delivery with the mix your destination needs. An event requiring several logos may receive too few complete allocations even when the total bag count looks sufficient. Send the required quantity for each version, receiving address and latest receipt date before the use date. Ask whether separate dispatches can be offered, then request quantities and arrival estimates for the first usable allocation and the balance. Compare that proposal with a single dispatch and allow time in your own plan to count and check the bags after receipt.

If one colour or artwork version is delayed, request a revised schedule that names the affected line. Ask whether the other lots can proceed separately and which dates change. Carry quantities already dispatched into the revision, alongside the outstanding quantities. Retain the earlier reply and mark the latest dated schedule as the current plan. Use the inquiry entry to send the line list and required receipt dates, then share the resulting allocation with the people receiving the bags.

Prepare this information

  • SKU or line reference, model, dimensions, body colour, artwork revision and ordered quantity
  • Written production start trigger, expected event date and schedule revision
  • Working-day or calendar-day basis, non-working dates and any sample milestones
  • Dated lot rows separating ordered, finished, dispatched and outstanding quantities
  • Required use date, latest receipt date, destination and usable SKU allocation
  • Single or split dispatch proposal with dates and quantities for the remaining balance
  • Latest dated schedule reply and changed milestones for affected versions