Skip to content
JINYUCOMMERCIAL KITCHEN EQUIPMENT
Menu

JINYU · Buyer question

How should a UK chain record approved refrigeration variants across cafe sites?

Give each cafe an equipment tag and maintain a register connecting that tag to the offered model, electrical configuration, drawing revision and document pack. Record the destination market for each site. Keep the chain's requested specification alongside the reviewed offer so a change in the proposed cabinet can be traced to the relevant design decision.

Use one row per site and configuration rather than one approval note for an entire series. For example, GN-900CT and GN-1200CT differ in width: 900 mm and 1200 mm respectively, with a shared 530 mm depth and 730 mm height. A counter drawing reviewed for one width cannot establish fit for the other. Attach the site measurement sheet to the row concerned.

Track substitutions with the previous and proposed identifiers, affected drawings and the reviewer response. Preserve the accepted revision for receiving and handover checks. Add the final unit identity after receipt so future parts questions point to the installed equipment. Send a specific variant question through the inquiry entry with the relevant model and site drawing reference, keeping private site contacts out of public specification documents.

Prepare this information

  • Site equipment tag register
  • Configuration and drawing revisions
  • Substitution and installed-unit history

View the matching cabinet series

Matching model records

Discuss your site and product arrangement

Send your equipment brief