JINYU · Buyer question
How should I record approved changes after reviewing a bag sample?
Record sample changes against a named sample and specification revision. For each observation, identify the panel or component, describe what was received and write the change you want made. Add annotated photographs or drawing references where position matters. A note saying improve the handles is difficult to interpret; naming the attachment location and showing the desired arrangement gives the revision a defined subject.
Keep accepted features and requested changes in separate columns. If a dimension changes, update the dimensioned drawing as well as the review notes. If artwork moves or changes scale, identify the affected panel and create a corresponding proof revision. Ask for a returned summary showing how each requested change has been interpreted, and compare that summary with your own record before recording approval.
State exactly which drawing, proof and sample references the approval covers. Keep unresolved observations visible rather than merging them into a general approved label. Share the revision list through the inquiry entry with the bag project reference and retain the reply beside it. For a later sample, check the listed changes individually and record which features were reviewed again, so earlier notes do not become detached from the bag they describe.
Prepare this information
- Identified sample observations
- Drawing and proof revisions
- Approval references