Skip to content
JINYUCOMMERCIAL KITCHEN EQUIPMENT
Menu

JINYU · Buyer question

How should I record thresholds and floor-level changes on a beverage cooler delivery route?

Give each threshold, step or floor transition a reference on the route plan. Take a wide photograph showing the approach and a detail photograph with the measurement points visible. Record the height difference and the shape of the transition, including a raised track or projecting edge. Show changes of level in a section where a plan view would hide them.

Identify the floor surfaces on both sides and photograph any visible damaged or loose area. Include nearby doors and the distance to the next turn or obstruction. If a building drawing supplies information that was not measured during the survey, label that source separately. A proposed temporary ramp belongs in the delivery discussion with the people responsible for the building and equipment movement; a photograph of a step does not specify an appropriate ramp.

Send the indexed route record with the GN-868FM configuration request through the inquiry entry. Have the delivery team review each transition against the proposed handling arrangement, and retain any agreed site preparation with the route revision. Keep unresolved transitions visible in that record. The page supplies a survey format, not a cabinet lifting, tilting or ramp-construction procedure.

Prepare this information

  • Transitions numbered on the continuous route
  • Level changes shown with measurement references
  • Site preparation linked to the delivery review

Review the two-door beverage cooler series

Matching model records

Discuss your site and product arrangement

Send your equipment brief