JINYU · Buyer question
What should I check before installing commercial kitchen equipment?
Start with a model-by-model installation schedule. Give each unit a line for its quantity, body dimensions, electrical rating and documented utility connections. On a measured room drawing, mark the intended equipment positions and the existing connection points. Send both documents together so the installer can compare the site with the selected equipment.
The two induction models need different entries. JY-TSPT-5D is a 5 kW, 220 V countertop soup cooker with a 400 x 500 x 200 mm body. JY-DTZL-15 is a 15 kW, 380 V floor-standing single pot steamer measuring 700 x 800 x 1250 mm. Ask for the electrical connection drawing, phase and frequency for each offered configuration. The installer can then assess the available supply and capacity for the planned equipment schedule. A socket photograph helps identify the location, but does not establish electrical compatibility.
Use the body dimensions to place each appliance, then draw the operating space around it. Beside the countertop cooker, show its support surface and the intended pot and handle positions. The steamer has an 800 mm worktop and a 1250 mm overall height; include room to handle its pot. Request the installation documents for ventilation and service-access distances. For delivery, measure the narrowest door, turns and lift access and compare them with the requested packed dimensions and weight.
List water and drainage connections for the equipment that needs them. The JY-DTZL-15 record identifies a backsplash faucet, but gives no inlet fitting size, water pressure or drain details. Request those details in a utility drawing before laying out the pipe route. If the project includes retained gas equipment, supply its identification and connection documents as a separate schedule entry. The two induction units are electric cooking equipment.
Attach the schedule, room drawing, connection-location photographs and selected model links to the equipment inquiry. Identify which installation documents are missing. Ask the installer to mark proposed site changes on the drawing, and keep that revision with the agreed model configuration for the delivery and installation handover.
Prepare this information
- Model codes, quantities, body dimensions and receiving route
- Available electrical supply and connection drawing for each unit
- Water, drain and any retained gas equipment connection details
- Support, cookware handling, ventilation and service access
Compare commercial induction cooking models