Start with the previously reviewed layout and give the changed assortment a new version. Mark which packages have been replaced, which counts have changed and which groups have moved between levels. Retain the old schedule as a separate record. A new photograph can show the revised display, but it leaves the earlier and later package weights difficult to compare unless the schedule changes are recorded too.
Recalculate the proposed load for every affected shelf using the revised filled-package masses and counts. Include changes to trays or dividers. Mark the new positions on the plan, even where the shelf total is unchanged: replacing several small groups with one pack changes the arrangement described in the earlier inquiry. Add any revised shelf or support reference to the same change list so the merchandise and equipment records stay connected.
Send the revision map, new schedule and earlier written loading response with the GN-868FM model reference. Ask which parts of that response still apply and which require a reply against the changed arrangement. Keep the resulting response attached to the new drawing version. A layout demonstrated for label visibility or bottle access answers those particular questions; it does not supply a loading document for the changed assortment. Use the evidence request to resolve that gap before treating the revised plan as the documented configuration.
Prepare this information
- Old and revised layouts kept separately
- Affected shelf totals and product positions updated
- Loading response attached to the revised drawing