JINYU · Buyer question

How do I prepare a handover checklist for a newly installed refrigerated display?

Start the handover checklist with the equipment identity, installed location and accepted configuration. Attach the commissioning record prepared by the responsible installer, with the checks actually performed and any outstanding items. Keep receiving-condition photographs separate so the owner can distinguish delivery observations from installation and operating checks.

Review the supplied accessories, shelf arrangement, documents and service access against the accepted order set. Confirm that staff can find the exact-model manual and the agreed fault-reporting route. Record the control settings handed over as documented by the installer; do not invent a universal commissioning temperature or test duration for every refrigerated display.

Give each open item an owner and record how its completion will be acknowledged. Demonstrate the operator tasks included in the supplied instructions and leave the corresponding worksheet with the store. The receiving supervisor and installer should retain the same final record, including any limits on the work completed. A signature without these attachments says little about which cabinet was installed, what was checked or what the operator still needs before taking responsibility for it.

Prepare this information

  • Commissioning attachments
  • Document and accessory check
  • Open-item ownership