JINYU · Buyer question
What evidence should I collect when reporting a mismatch between ordered and received bag specifications?
Start a mismatch record with the order item reference, drawing revision, approved sample identifier and receiving date. Identify the affected cartons and bags using internal codes. Photograph the carton labels and received arrangement before repacking. Retain the documents that define the ordered feature, so the record can show the agreed requirement beside the observed condition rather than relying on a general complaint.
Use one entry per issue. For a dimensional difference, show the ruler endpoints and measurement condition. For artwork, include the approved file revision and the affected panel photograph. For construction, mark the seam or component on an overview image. Record the inspected quantity and the number of bags showing that issue, keeping this count separate from any quantity that has not yet been inspected.
Keep original images with their filenames and attach a short index linking each image to its issue entry. Describe any unpacking or handling performed after receipt. Send the indexed summary through the inquiry entry with the bag project reference, excluding personal information from shared images. This creates a record that another person can compare with the ordered specification and the retained sample.
Prepare this information
- Order, sample and carton identifiers
- Requirement beside observed condition
- Indexed photographs and inspected counts
View the canvas tote bag project