What should an Australian hotel designer request before approving a refrigeration shop drawing?

Request a dimensioned drawing for the exact cabinet model and configuration, showing the viewing side, loading side, connection location and maintenance access. Place it on the hotel plan with the buffet joinery and neighbouring equipment. Use an equipment code and drawing revision so comments about the room layout can be separated from changes to the cabinet itself.

For GN-1200R2, start with the recorded 1200 × 730 × 1200 mm body and service-side sliding doors. Add the supplier's installation clearances and access requirements separately. A joinery opening equal to the cabinet's width does not establish an acceptable installation. For a hinged-door beverage display, request the door movement envelope and compare it with guest circulation and replenishment space. Include the route used to bring each cabinet into the room.

Mark unresolved dimensions, ventilation paths and service access directly on the drawing. Return the marked revision to the supplier and relevant hotel contractors, then collect their responses against those comments. Retain one accepted drawing set with the electrical schedule and model record. Send the plan and precise missing dimensions through the inquiry entry; an overall product photograph cannot replace the measurements needed to approve fitted joinery.

Prepare this information

  • Configuration-specific shop drawing
  • Clearance and access overlays
  • Accepted drawing revision

Compare straight-glass cake display records

Matching model records

Discuss your site and product arrangement

Send your equipment brief