Skip to content
JINYUCOMMERCIAL KITCHEN EQUIPMENT
Menu

JINYU · Buyer question

What should a US buyer confirm about the supplied model label before shipment?

Request a legible equipment-label drawing for the supplied model and electrical configuration, then compare it with the accepted equipment schedule. Check the model identifier, electrical ratings and other fields required by the project review. Keep a label drawing separate from a photograph of an unrelated unit used as a layout example.

Ask how the final unit identifier will be recorded against the shipment documents. If certification markings are offered, obtain the corresponding exact-model evidence and have the project reviewer check its scope. A visible symbol alone does not resolve whether the offered configuration is covered. The linked cabinet records are references for selection and do not establish US approval or a particular label marking.

Before shipment, compare the supplied label evidence with the current order configuration and document any mismatch for resolution. Retain the accepted image or drawing in the equipment file, alongside the electrical and installation documents. This gives the receiving team a specific identity check and the service team a reliable starting point later. Avoid describing a whole series as accepted when the review concerned only one identified version.

Prepare this information

  • Label drawing and equipment schedule
  • Configuration-specific supporting records
  • Final identity check record

View the matching cabinet series

Matching model records

Discuss your site and product arrangement

Send your equipment brief