JINYU · Planning guide
US restaurant refrigeration: equipment records and site handover
Start the equipment discussion with the US project location, the intended food-service use and the people reviewing the installation. Keep the restaurant designer's requirements, the offered cabinet configuration and the reviewing authority's response in separate records. A catalog selection is only the starting point for that comparison.
GN-1200R2 measures 1200 × 730 × 1200 mm; GN-1130SC measures 1130 × 405 × 280 mm. These cabinet body dimensions identify two different equipment arrangements. They do not establish a US electrical version, sanitation certification, local acceptance or installation allowance. Request documents for the exact configuration under consideration.
The questions below cover the submittal, equipment label, destination parts responsibilities and the physical receiving route. Electrical and sanitation evidence need separate reviews. Give the project reviewer the model-specific records and keep unresolved items attached to the equipment tag rather than treating a familiar mark or series name as a complete approval.
For site handover, distinguish unloading, unpacking, movement and final placement. Share the same route sketch with the carrier and installer. Send your model reference and the particular document or access question through the inquiry entry so the reply addresses the planned restaurant rather than a generic destination.
Questions to resolve before ordering
- What electrical information should a US buyer send before ordering a display fridge?
- How should a US restaurant ask about sanitation certification for a specific cabinet?
- What should a US importer verify about electrical safety documentation before choosing refrigeration?
- How do I prepare an equipment submittal for a US restaurant designer?
- What should a US buyer clarify about who unloads a refrigerated cabinet?
- How should a US store document a commercial delivery location with restricted truck access?
- What should a US buyer ask about local replacement parts support?
- How do I compare metric cabinet dimensions with a US floor plan drawn in inches?
- What should a US buyer confirm about the supplied model label before shipment?
- Which questions should a US installer resolve before a display cabinet enters a fitted kitchen?