Revise a custom bag inquiry with a complete current specification, field-by-field changes and a worked 180-to-210-bag quantity, artwork and destination record.

Backpack and travel bag with carry handles and a separate shoulder strap

Worked inquiry revision: 180 bags become 210

All bag line identifiers, quantities, artwork and destinations below are illustrative buyer inputs. CT-01 and TB-01 are worksheet references. They do not identify stock products or a JINYU catalogue specification.

Inquiry revision B: complete current schedule beside revision A quantities
LineRequested formatA quantityB quantityB artworkB destination
CT-01Custom canvas tote120150ART-C1 revision 2Destination A
TB-01Custom travel bag6060ART-T1 revision 1Destination B
Requested bags180210Change: +30 bags

Three changed fields, each with its own response

Change list accompanying the complete revision B specification
LineFieldRevision ARevision BRequested response
CT-01Requested quantity120150Increase of 30; repeat 150 on current schedule
CT-01ArtworkART-C1 revision 1ART-C1 revision 2Request proof identifying revision 2 and bag face
TB-01DestinationDestination ADestination BRequest movement scope for revised destination

Read the returned values against the revised request

This illustrative reply matches the tote quantity but still uses the earlier artwork and destination. Keep the matching field and the two differences visible in the response record.

Example response review against inquiry revision B
FieldRequestedReturnedRecord or next question
CT-01 quantity150150Quantity reconciled
CT-01 artworkART-C1 revision 2ART-C1 revision 1Request response and proof for revision 2
TB-01 destinationDestination BDestination ARequest destination B movement scope

Carry the complete inquiry revision into the JINYU inquiry brief, with the specification and change record identified together.

How do I revise a custom bag inquiry after receiving a quotation?

Give the revised inquiry its own reference and state which earlier request it replaces. Send the complete current specification with a short change record, so the respondent can read both the final request and the differences. Keep the earlier quotation beside its original inquiry. A quotation answering revision A remains evidence for revision A until a response identifies what it covers in revision B.

Start the change record with the bag line, field, previous value and requested value. Then identify the document or drawing that defines the change. Ask the response to repeat the current inquiry revision and address each changed line. Use the example below to structure that exchange: its quantities, artwork references and destinations illustrate a purchasing record, rather than an available JINYU product configuration.

Should I send only the changed lines or the whole specification?

Send a complete current schedule and a separate list of changes. The current schedule tells the recipient what to quote now; the change list explains how it differs from the previous request. Include unchanged lines in the current schedule, preserving their identifiers. That lets the recipient reconcile the total without reconstructing it from several messages and attachments.

In the worked example, revision A has 120 canvas totes and 60 travel bags, giving 180 bags. Revision B has 150 canvas totes and the same 60 travel bags, giving 210. The difference is 30 bags, all on line CT-01. If a message says only to add 30, the recipient still needs to know the affected bag line, artwork allocation and destination. Revision B supplies those fields together.

How do I keep artwork changes separate from quantity changes?

Give the artwork file a reference and revision, then assign it to the affected bag line. Record which body face or component it applies to. A revised quantity does not by itself select an artwork file, and a new attachment does not explain whether it replaces every earlier version. Include the current artwork reference in the complete specification even where the artwork is unchanged.

For CT-01 in this example, artwork ART-C1 changes from revision 1 to revision 2 while quantity rises from 120 to 150. Write those as two changes. Keep the 60 travel bags on ART-T1 revision 1. Ask the returned proposal and any proof to identify the same references. Review print placement against the bag drawing; the filename alone supplies neither placement nor the print method.

What happens when only the destination changes?

Retain the equipment or bag specification and identify the destination field separately. Include the requested receiving address and endpoint in the actual inquiry attachments. Where a previous transport response used an earlier destination, request a response addressing the new one. Keep the original response with its original destination rather than silently changing the address beside it.

The example changes TB-01 from Destination A to Destination B while leaving its quantity and artwork unchanged. The quantity total therefore stays at 60 for that line. A revised destination does not mean the travel bag construction has changed. Ask the respondent to distinguish product details from the movement scope, and carry any returned packing or transport document references into the revised response record.

How should the reply distinguish accepted changes from alternatives?

Put the requested value and returned value in separate columns. Preserve the wording of any proposed alternative and attach its drawing or specification reference. Then identify the question still requiring an answer. A reply referencing revision B can still contain a different material, construction or artwork allocation; the revision label helps locate the response, but the individual lines establish what was offered.

For example, if a response repeats 150 totes but identifies ART-C1 revision 1, the quantity matches and the artwork reference differs. Record those outcomes separately. Request the artwork response against revision 2 instead of treating the entire line as reconciled. When the offered alternative changes another field, add that field to the comparison so the final specification reflects the actual proposal under review.

Which sample and proof records need a fresh reference?

Identify the specification represented by each sample, proof or drawing. Keep the earlier record and state which current fields it still documents. A quantity-only change may leave a drawing reference unchanged, while a material, attachment or print-placement change raises a different comparison. Ask the respondent to identify the affected documents and the sample or proof proposed for reviewing that change.

In the example, the tote artwork revision needs a current artwork response. The quantity increase alone does not describe a different tote construction. If the respondent also proposes a changed handle attachment, record that new proposal explicitly and connect it to the bag drawing and sample record. Avoid relabelling a photograph of an earlier sample as the current specification without identifying which details it actually represents.

What belongs in the final revised inquiry package sent to JINYU?

Send the inquiry identifier and revision, complete current line schedule, change record, bag drawings, artwork references, destination information and the earlier quotation being reviewed. State the question beside each changed field. Include intended quantities as requested project quantities, keeping them distinct from any statement about availability. JINYU custom canvas totes, backpacks and travel bags follow a custom project brief; small-quantity non-woven selection starts with the stock range.

Address the package to JINYU, Shaanxi Jinyu Kitchenware Co., Ltd. (陕西金宇厨具有限公司). Ask the response to identify the inquiry revision, repeat the offered specification and list any alternatives. Retain that reply with the current schedule. The resulting record lets purchasing, artwork review and receiving work from the same identified bag lines, while preserving the earlier documents that explain how the request changed.

Reference sources

Regional references support general planning; model-specific specifications come from the published JINYU model tables.