Skip to content
JINYUCOMMERCIAL KITCHEN EQUIPMENT
Menu

JINYU · Buyer question

How do I choose the right equipment size for a professional kitchen?

List the tasks each station handles during your busiest service period. Record the menu, orders per interval, ingredients needed together and time available for replenishment. Seat count describes part of the demand, but it does not specify pan space or cooking capacity. Send the workload with your inquiry and ask for a proposed pan layout or a cooking trial using the same portion sizes and batch sequence.

Compare the topping station against two current model records. GN-1130SC measures 1130 x 405 x 280 mm and has four 1/3 GN pan positions. GN-1305SC measures 1305 x 405 x 280 mm and has five. The fifth position takes another 175 mm across the counter frontage. Decide whether you need that extra ingredient position or can replenish a four-position arrangement during service. Their recorded 42 L and 52 L capacities do not establish meals per hour.

Mark the appliance body on a measured counter drawing. Add the preparation area, staff approach and space above the hinged lid. Request open-lid dimensions and the installation drawing for the offered configuration, then add its ventilation and service-access requirements. Draw the cable route as well. A body that fits beneath a shelf may still lack room for the lid to open.

Treat the cooking station as a separate layout task. JY-TSPT-5D has a recorded 400 x 500 x 200 mm body, one flat cooking surface and a 5 kW rating at 220 V. Request the usable cooking area and cookware size limits before positioning your pots on the drawing. Include space to set down finished food. A trial with your stated portions, cooking steps and batch timing can address the workload that external dimensions alone cannot describe.

Send the room drawing, service notes and selected model links through the equipment inquiry. State the destination voltage and available electrical capacity, and request the connection requirements for each offered unit. Measure the narrowest door, turns and lift on the receiving route. Ask for packed dimensions and weight to compare with that route. Review capacity, operating space and delivery access together before selecting the equipment size.

Prepare this information

  • Peak-service workload, menu and replenishment interval
  • Pan positions, cookware and batch sequence
  • Appliance body, open lid and working area on the layout
  • Electrical supply, installation access and packed receiving dimensions

Compare countertop topping prep fridge sizes

Matching model records

Discuss your site and product arrangement

Send your equipment brief