Skip to content
JINYUCOMMERCIAL KITCHEN EQUIPMENT
Menu

JINYU · Buyer question

How should I record floor levels at a replacement cabinet position?

Label the replacement cabinet position on the plan and mark one fixed height datum for the survey. Record the finished floor at the front-left, front-right, rear-left and rear-right corners of the proposed footprint relative to that datum. State which side faces the customer. Include the survey date, measuring method and photographs with corner labels. Identify the selected survey revision on the level sketch and link each reading to its marked location. Use the same datum for readings along the approach to the cabinet.

For an illustrative survey with a fixed reference level of 0 mm, the corner readings are front-left +0 mm, front-right +6 mm, rear-left +2 mm and rear-right +8 mm. Positive readings mean the floor is above that reference. The right side is 6 mm higher than the left at both ends, and the rear is 2 mm higher than the front on both sides. Keep these measured floor levels separate from any proposed cabinet body-bottom level or support setting. Map the offered support locations onto the survey using the base drawing for the exact offered configuration. Record the base drawing revision beside the support layout and identify the survey revision used for the comparison.

Mark thresholds, floor joints, drains, steps and raised finishes around the position. Give retained joinery a reference on the plan and record its underside level against the same fixed height datum at the relevant sections. A height measured from the local floor at one corner can conceal a different gap at another. Record observations about uneven or damaged finishes next to their locations. Photographs show those conditions but do not establish floor strength or support capacity.

If a revised layout moves the cabinet footprint, show its previous and proposed positions against the same wall reference. Record whether the cabinet front or rear follows the selected alignment line. Measure the floor at the revised corners and add dated readings and photographs at those locations. Retain the original readings, photographs and level sketches with their original position, survey date and drawing revision. Recheck the joinery sections at the revised footprint. A change to the proposed cabinet body-bottom level belongs in the elevation beside its previous value, separately from the dated floor observations.

Request the proposed cabinet base drawing, adjustment details and installation requirements for review with the site team. Mark inaccessible points as unmeasured. List assumptions separately from measured floor levels, with the source document or person and date for each. Put proposed floor or joinery work in a separate action list. If a later measurement replaces an assumption, link the dated reading and its location in the revised comparison. Retain the assumption in the earlier comparison with its original survey and cabinet drawing references. Send the level sketch and photographs through the inquiry entry with the model code, offered configuration, cabinet position label and selected survey and cabinet drawing revisions. The base drawing and adjustment details provide the information needed to compare the proposed support arrangement with the measured floor.

Prepare this information

  • Corner labels, survey date, selected survey revision, sign convention and one fixed height datum
  • Original readings, photographs and level sketches retained alongside dated readings at revised footprints
  • Measured floor and joinery levels separated from proposed base levels, support settings and sourced assumptions
  • Exact offered base drawing revision, selected survey revision and dated readings replacing earlier assumptions

Compare the open-front display series

Matching model records

Discuss your site and product arrangement

Send your equipment brief