JINYU · Buyer question
How do I record equipment access restrictions on a restaurant renovation brief?
Record renovation restrictions as a measured route from the unloading point to the final equipment position. Identify narrow doors, turning corridors, stairs, floor changes and protected finishes. A cabinet that fits the finished kitchen footprint can still be unsuitable for the route available during the renovation.
Show which partitions, counters and door leaves will be present when the equipment arrives. Mark temporary openings separately and identify who is responsible for making them available. Request packed dimensions and handling instructions for transport planning; bare cabinet dimensions are only one part of the access review.
Have the appointed handling team assess the route and the equipment package before delivery arrangements are agreed. Keep the assessment with the site plan so a later programme change does not remove an essential access opening. Send route photographs, measured pinch points and the proposed installation position in the inquiry. If the cabinet changes, repeat the route check using the new package and handling information instead of relying on the previous footprint comparison.
Prepare this information
- Measured route and pinch-point photographs
- Temporary openings and responsibilities
- Packed dimensions and handling information
Compare the matching equipment series