What belongs in the final survey handover for a display cabinet replacement?
Create a dated handover index for the site plan, elevations, counter sections, photographs and measurement record. Give each document its reference, revision and date, and mark the selected version. Identify who supplied each measurement. Include the existing cabinet reference and the exact replacement model and offered configuration. For the offered cabinet drawings, installation documents and handling documents, record the selected document references, revisions and dates beside that configuration. Retain superseded documents with their original readings and identify their replacements in the index.
Identify the fixed height datum on the plan and in the level record. For each surveyed footprint, include the front-left, front-right, rear-left, and rear-right floor readings, and state the customer side, measuring method, and sign convention. If a revision moves the cabinet, show the original and revised footprints against the same wall reference. Give each footprint its own dated readings and record whether the cabinet front or rear follows the selected alignment line. Keep measured floor and joinery underside levels separate from proposed cabinet body-bottom levels and support settings.
Label each comparison with its own date and revision, the selected survey reference and revision, and the selected offered drawing reference and revision. Include the cabinet body position, retained joinery, staff access, service locations and equipment route. Reference the offered document used for each opening envelope, installation allowance or packaged dimension. At a moved footprint, include the revised joinery sections and identify locations still unmeasured. Keep unresolved drawing questions beside the affected location.
List assumptions separately from measurements. Give each assumption its source document or person, date and the footprint, fitting or survey point it concerns. If a clearance assumes removal of a fitting, reference the fitting and the drawing of the proposed opening. Put proposed removals and site alterations in an action register with the responsible party and the drawing that defines the work. Keep proposed work separate from the measured existing arrangement.
When a later measurement replaces an assumption, link the dated reading to that assumption in the revised comparison. Record the marked location, surfaces measured and the survey reference and revision containing the reading. If the measurement point moves, show the new point against the same datum and wall reference and retain the earlier point. Keep original readings against the footprint where they were taken. Preserve the earlier assumption and its dated source in the earlier handover so the recipient can trace what changed.
Send the indexed set through the inquiry entry with its handover date and revision. List changed readings, replaced assumptions and revised offered documents in the new index. Keep each earlier handover index and its comparison drawings together with the survey views, readings and offered documents used for that review. Record changes to the offered configuration or proposed base level in a revised comparison. Review the selected installation and handling documents alongside the measured site record when assessing the replacement fit.
Prepare this information
- Dated handover index with selected survey and exact offered document references, revisions and dates
- Fixed height datum, named alignment and separate dated readings for original and revised footprints
- Comparison references for measured levels, proposed settings, opening envelopes and equipment route
- Dated assumption sources and replacement readings linked by location, measured surfaces and survey revision
- Earlier handover sets retained with their original survey views, comparisons and offered documents