Four cabinet records · drawing and site review

Display fridge size: resolve conflicting drawing dimensions

Check JINYU cabinet dimensions against supplier drawings and site measurements with four model records, worked dimension differences and a revision worksheet.

Compare the recorded body dimensions →
JINYU GN-1200RT straight glass cabinet on a cafe counter
JINYU GN-1200RT countertop cake display: 1200 × 530 × 730 mm.

Compare complete model codes and all three dimensions

Recorded JINYU body dimensions. Site openings, packed dimensions and installation envelopes are separate records.
JINYU modelW × D × H (mm)InstallationShelvesService access
GN-900RT900 × 530 × 730 mmCountertop22 sliding doors at rear
GN-1200RT1200 × 530 × 730 mmCountertop2 chrome-plated shelvesSliding doors at rear
GN-1200RF21200 × 730 × 1200 mmFreestanding2 glass shelves2 sliding doors on the service side
GN-1200CK31200 × 740 × 1300 mmFreestanding3 glass shelves2 sliding doors on the service side

Worked dimension differences

Arithmetic examples; the 540 mm drawing value and 1250 mm bay are illustrative, not model specifications.
ComparisonCalculationMeaning
RT depth: millimetres / centimetres530 mm = 53 cmSame body dimension in two units
RT depth / example drawing540 - 530 = 10 mmDifference to explain against the drawing endpoints
1200RF2 / 1200CK3 depth10 mmDifferent model bodies with the same width
1200RF2 / 1200CK3 height100 mmUpdate the elevation with the replacement model
Example bay / 1200 mm body1250 - 1200 = 50 mmGross difference before installation requirements

Which display fridge size should I use when two documents disagree?

Keep the two values as separate records until the dimension endpoints and model identity have been checked. Copy the complete model code, document title, revision and unit beside each figure. A catalogue body dimension, a packed shipping dimension and an available site opening describe different objects. Replacing one with another can hide the reason for the disagreement.

For example, JINYU GN-1200RT has recorded overall dimensions of 1200 × 530 × 730 mm, while GN-1200RF2 is 1200 × 730 × 1200 mm. Both begin with a 1200 mm width. A drawing labelled only 1200 display does not distinguish them. Ask for the full model reference on the returned drawing and retain its width, depth and height together.

How can equal widths conceal a different cabinet size?

The comparison table puts three 1200 mm-wide cabinets beside a 900 mm countertop model. GN-1200RT is a countertop display, GN-1200RF2 is a freestanding two-shelf display and GN-1200CK3 is a freestanding three-shelf display. The recorded body depths are 530, 730 and 740 mm respectively. Equal frontage therefore leaves depth differences of 200 or 210 mm when comparing RT with the floor-standing models.

The listed heights are 730, 1200 and 1300 mm. For the countertop unit, the support surface contributes separately to its top height above the finished floor. When a schedule and drawing share the same width but differ elsewhere, compare all three dimensions before deciding that a figure is a typing error. Identify the equipment line and installation type as well as the model number.

How do I distinguish a unit conversion from a real discrepancy?

Convert both values into one unit while preserving the original numbers. Millimetres divided by 10 give centimetres; millimetres divided by 25.4 give inches. GN-1200RT has a recorded depth of 530 mm, equivalent to 53 cm or approximately 20.87 inches. A document showing 53 cm refers to the same depth. An illustrative drawing showing 540 mm differs by 10 mm; that is a dimensional difference requiring an explanation.

Record whether a converted value was rounded and how many decimal places were retained. Do not round the source millimetre figure to make two documents agree. Keep a separate column for the normalized value, another for the difference and a final one for the explanation returned against that specific drawing. The arithmetic identifies the difference; it does not establish an acceptable tolerance.

What endpoints should a cabinet drawing identify?

Ask which surfaces define overall width, depth and height. Show the front and service side, the supporting floor or counter surface, and any projecting parts represented in the outline. Request the installation and service-space dimensions as separate annotations. A body outline and an installation envelope can both be correct while giving different totals because they have different endpoints.

On the site record, identify the faces used for the available opening measurement. A wall-to-wall measurement, a trim-to-trim clear opening and the distance between counter end panels can differ. Photograph each endpoint and place its reference on the plan. Comparing labelled endpoints gives the reviewer a specific question, such as whether the quoted depth includes the feature shown at the service side.

Can I assign a tolerance to close the difference?

The published overall dimensions used here do not provide manufacturing tolerances. A difference between two numbers is therefore recorded as a difference, rather than accepted or rejected using an invented allowance. Request the dimensional tolerance, its applicable features and the corresponding model drawing if those details are needed for a fitted opening or equipment replacement.

For an illustrative 1250 mm-wide bay, a 1200 mm-wide cabinet leaves a gross arithmetic difference of 50 mm. That figure is neither an installation clearance nor a tolerance. Wall irregularity, the defined measurement endpoints and the selected model installation requirements remain separate inputs. Retain the site survey and the returned model documentation together when the responsible project team reviews the final position.

What changes if the proposed replacement has the same width?

Use a before-and-after row containing all three body dimensions. Replacing the GN-1200RF2 outline with GN-1200CK3 keeps width at 1200 mm, increases depth by 10 mm and increases height by 100 mm. Their recorded shelf counts also differ: two glass shelves for RF2 and three for CK3. These are comparisons of the model records, not a statement that either cabinet is an interchangeable replacement.

Update the plan and elevation, then request the replacement model installation drawing and usable shelf measurements. Review the loading route and connection documentation against the new model reference. Keep the previous dimensions in the revision record so the people coordinating furniture, shelving and site access can see which assumptions changed.

How should the resolved dimension be handed over?

Use one equipment reference across the model shortlist, site plan and returned drawing. Keep the conflicting values, their document sources and the written explanation in the same record. Record the selected model, drawing revision and the date the explanation was received. Update the affected plan and elevation with that revision rather than leaving an unlabelled corrected number in a message.

Send JINYU the four-part review: equipment identity, source dimensions, labelled site measurements and the specific discrepancy question. Include the destination electrical supply and tray requirements as separate inquiry items. Ask for a response tied to the full model code. When another document arrives, compare its revision and dimension endpoints with the resolved record before carrying its numbers into the equipment schedule.

Dimension discrepancy record

Retain both original values and identify the document resolving the difference.
FieldBuyer recordsRequested response
Equipment identityFull model code and equipment positionSame model code on the returned drawing
Dimension sourcesBoth values, units, document names and revisionsExplanation tied to each dimension endpoint
Site measurementEndpoint labels, measured value and photographInstallation drawing for review against that location
Tolerance requestFeature or fitted opening requiring reviewApplicable documented tolerance for the selected model
ResolutionExplanation, selected revision and affected plansRevised model-specific drawing and equipment schedule

Send the model code and dimension question →