How do I carry a selected beverage cooler row option into the installation drawings?
Name the selected option and the drawing revision on the installation plan. Retain its cabinet position references in the elevation and equipment schedule. For example, if option B places JY-LC-318 at B1 and JY-FS-2D at B2, use B1 and B2 beside their connection and door details. Identify the survey drawing, its revision and the measurement datum used for the layout. These references let the installer trace each cabinet position back to the surveyed wall and floor level.
Transfer each selected model code and its recorded width, depth and height into the equipment schedule. Use that schedule to draw each body in plan and elevation, retaining the front or rear alignment chosen in the option. Show the body-width total, end panels and installation spaces as separate dimensions. Beside B2, reference the equipment drawing number, revision and offered model version used to locate connections, door movement, ventilation and maintenance access. Dimension connection points from the same reference lines used for the cabinet position.
List the plan, elevation, schedule and equipment details with their document numbers and revisions in the drawing issue. Send that set through the inquiry with a question tied to a position, such as where B2 connects relative to the surveyed wall. Keep the reply with that installation revision so its model assignment and referenced details remain traceable. If B2 later changes model, use the linked substitution answer to record the previous assignment and the affected drawing changes.
Prepare this information
- Selected option, survey revision and cabinet positions match across the drawing set
- Schedule model codes and dimensions match the bodies drawn in plan and elevation
- Issued document list and inquiry reply identify the installation revision
Revise the installation drawings after a model substitution