Identify the survey drawing revision and its issue date in the handover message. List the plan, elevation, and sections, with a document number and revision for each. Name the issue that this handover replaces, and keep it in the project record. Retain each cabinet position label across the drawings, schedule and photographs. If C2 changes model, keep C2 as the position and record the old and new model assignments in its schedule row.

Carry the fixed height datum and the selected front or rear alignment into the revised views. For an illustrative handover, C1 is JY-LC-318 with a proposed body-bottom level of +10 mm, so its top is 10 + 1900 = 1910 mm. C2 is JY-FS-1D with a proposed body-bottom level of +20 mm, so its top is 20 + 2010 = 2030 mm. Record both levels relative to the same datum. These are example layout levels, separate from measured floor readings or support settings. If the alignment changes, show the previous and revised footprint positions, and identify which floor readings belong to each.

Write a change note for each affected position or fixture. A newly measured end-panel position beside C2 can cite its measurement date, endpoints, and photograph reference. Put the previous drawn value beside the new measured value using the same reference line. Distinguish that site observation from a proposed panel movement. Where a cabinet footprint moves, include the floor measurements at its new corners. The linked floor-level answer explains how to label those readings and calculate cabinet tops.

Attach the document list, revised survey, and referenced photographs to the inquiry, with the affected model codes and cabinet labels. Ask about the changed detail, such as access beside the newly measured end panel at C2. Record the reply date and the survey revision it addresses, together with any equipment drawing reference it cites. Carry a proposed layout change into the next drawing revision while retaining the original measurement record.

Prepare this information

  • Cabinet position labels match across drawings, schedule and photographs
  • Fixed height datum and selected alignment accompany revised footprints and levels
  • Dated measurement changes and inquiry replies identify their survey revision

Record floor levels and alignment at the revised footprints