How do I mark electrical connection positions on a beverage cooler row drawing?

Label each cabinet position as C1 or C2 on the plan, elevation and equipment schedule. Give the existing supply point for that cabinet a separate label, such as E2. Dimension E2 horizontally from a named wall datum and vertically from the finished floor. Photograph the supply point with those references visible. Record whether E2 is behind the cabinet, beside it or inside adjacent joinery. Label proposed supply points separately from the measured existing points.

For an illustrative elevation, E2 is 950 mm from the wall datum and 450 mm above the finished floor. The proposed left edge of C2 is 700 mm from that wall datum, so E2 is 950 - 700 = 250 mm to the right of the cabinet edge. If C2 moves 80 mm to the right, its left edge becomes 780 mm and the relative offset becomes 950 - 780 = 170 mm. The fixed E2 coordinates remain 950 mm horizontally and 450 mm vertically. These example site values locate a supply point relative to a cabinet outline. For the offered version, request the cable exit position, supplied cable details, connection type and equipment drawing revision.

On the plan, trace the proposed cable route from the documented cabinet connection to E2, including turns and joinery openings. Use the selected equipment drawings to show connection access and installation spaces. The horizontal offset alone does not give the cable route length. Have the site electrician review the arrangement against the selected equipment electrical data and mark any proposed relocation. Send the plan, elevation and E2 photograph through the inquiry with the cabinet position and model code. The linked installed-row question explains how to record the measured positions after a layout change.

Prepare this information

  • Existing supply point has its own label and fixed horizontal and vertical coordinates
  • Cabinet-relative offset updated when the proposed cabinet position changes
  • Equipment connection drawing and routed cable path linked to the cabinet position

Record the installed row against the revised drawing