How do I record the installed cooler row against a revised layout drawing?
Use the revised installation drawing as the comparison sheet and date the installed-condition record separately. Retain B2 as the cabinet label across the plan, elevation, equipment schedule and photographs. Carry forward S1 for the opening and S2 for the sign from the earlier survey and correction record. Identify both measurement endpoints, and record the drawing number and revision beside each measured value.
Continuing the illustrative S1 correction, revision R2 shows a proposed opening of 1780 mm from the wall reference to the inside face of the end panel beside B2. Suppose the installed opening measures 1778 mm between those same endpoints. Record the measured-minus-proposed difference as 1778 - 1780 = -2 mm. The panel face is 2 mm closer to the wall reference than proposed. Add the measurement date and a photograph showing the endpoints to the S1 entry. Preserve the earlier 1760 mm survey reading and the proposed 1780 mm value as separate entries.
Use the same fixed height datum for the elevation measurements. In the earlier S2 example, the measured sign underside is +2190 mm. B2 is JY-FS-1D with a recorded body height of 2010 mm and a proposed body-bottom level of +30 mm, giving a proposed top of 30 + 2010 = 2040 mm. Suppose the installed cabinet top measures +2038 mm and the sign underside still measures +2190 mm on the new survey date. The measured top difference is 2038 - 2040 = -2 mm. The measured vertical gap is 2190 - 2038 = 152 mm, compared with the proposed 2190 - 2040 = 150 mm. Record the top and sign readings in the S2 entry, with photographs identifying each endpoint. Keep measured floor readings separate from the proposed body-bottom level.
Record the measured front and rear body positions on the plan against the selected front or rear alignment. If the cabinet footprint has moved, mark its proposed and installed positions and identify the floor readings at the installed footprint. Keep B2 and its installed model code in the schedule. These illustrative differences describe geometry and establish no installation tolerance or ventilation requirement. Send the revised drawing, dated measurements and photographs through the inquiry entry with B2 and S1 or S2. Carry the same references into the linked response record so each drawing reply addresses the measured item.
Prepare this information
- B2 and S1 or S2 connect the revised drawing, dated measurements and photographs
- Measured opening, sign and cabinet top compare with proposed values using matching endpoints and one height datum
- Installed footprint and floor readings retain the selected alignment and remain separate from proposed body-bottom levels
Track a remaining position difference and its drawing response