Link the agreed action to its numbered survey entry, such as S1. Record the agreement date, cabinet position, and drawing number and revision. Retain the cabinet label across the plan, elevation, equipment schedule, and photographs. Describe the change, such as moving the end panel beside B2 while retaining the selected cabinet. Keep the original drawn and measured values in S1. The linked measurement answer explains how to record those observations.
In an illustrative correction record, S1 lists a drawn opening of 1800 mm and a measured opening of 1760 mm, both from the wall reference to the inside face of the end panel. Suppose the agreed action moves that panel to give a proposed opening of 1780 mm. Record the drawing change as 1780 - 1800 = -20 mm. Record the proposed movement of the panel from its measured position as 1780 - 1760 = +20 mm away from the wall reference. Retain the 1760 mm observation in S1. The proposed 1780 mm opening is separate from a later site measurement or an installation-space requirement. Show the revised panel position using the same endpoints, and retain B2 with its model code and body dimensions in the schedule.
Carry the fixed height datum and selected alignment into the revised views. For a separate illustrative vertical correction, S2 records a measured sign underside of +2190 mm. B2 is JY-FS-1D with a body height of 2010 mm. If the agreed proposal changes its body-bottom level from +20 mm to +30 mm, the proposed top changes from 20 + 2010 = 2030 mm to 30 + 2010 = 2040 mm. The gap below the measured sign changes from 2190 - 2030 = 160 mm to 2190 - 2040 = 150 mm. Keep both proposed levels distinct from measured floor readings. Retain the selected front or rear alignment when the panel alone moves. If a cabinet footprint also moves, show the old and proposed positions, and identify the floor readings for the proposed footprint.
List the affected plan, elevation, schedule and equipment detail revisions in the drawing issue. Use the selected version's equipment drawing to identify changes affecting ventilation, door movement, connections, or service access. The calculated gaps describe the example geometry, not a specified installation clearance. Send the revised drawing and agreed action through the inquiry, together with the model code, B2 label, and relevant S1 or S2 reference. After the physical change, add a dated measurement and photograph under that reference. Record the measured opening or cabinet top next to its proposed value so the reader can compare the revised drawing with the installed position.
Prepare this information
- Agreed action retains its survey reference and cabinet position label
- Original observations and proposed changes use matching endpoints and one height datum
- Revised alignment and geometry accompany dated measurements after the physical change
Prepare the site measurement difference record